The new building continues to come together as we move into Spring. The concrete is poured in almost every section of the building and the academic wings are looking almost ready for students! Here's a sneak peek of what is going on inside our new building this month:
The walking track along the edges of the gym is almost completely poured
Classroom in Academics wing
Main Entrance

Art Room with outdoor access
Display case at bottom of main staircase
Main entrance & Academic Wing
FACS Lab
Biology Lab
View from entry doors at the end of academic wing
Chemistry/Physics Lab
Built-in storage in classroom (Top Floor of Academic Wing)
Carpet squares in classroom (Top Floor of Academic Wing)
Men's Room on Top Floor
7th & 8th Grade Science Lab
